Thermal InsulationII.A – Art. 5, paragraph 1, subparagraph a)
|
Work on opaque surfaces that enclose the climate-controlled space. |
40% of eligible expenses, up to €1,000,000. |
Replacement of Windows and DoorsII.B – Art. 5, paragraph 1, subparagraph b)
|
Replacement of transparent enclosures, including window and door frames, that define the climate-controlled space. |
40% of eligible expenses, up to €500,000. |
Shielding and ShadingII.C – Art. 5, paragraph 1, subparagraph c)
|
Installation of external shading, sunshade, or solar filtration systems on the transparent enclosures provided for by the mechanism. |
40% of eligible expenses, up to €10,000, €30,000, or €90,000 depending on the system. |
Conversion to an NZEB BuildingII.D – Art. 5, paragraph 1, subparagraph d)
|
Renovation of existing buildings aimed at converting them into nearly zero-energy buildings. |
65% of eligible expenses, up to €2,500,000 or €3,000,000 depending on the climate zone. |
Efficient LightingII.E – Art. 5, paragraph 1, subparagraph e)
|
Replacement of existing lighting systems in interior spaces and outdoor areas. |
40% of eligible expenses, up to €50,000 or €140,000 depending on the type of light fixture. |
Building AutomationII.F – Art. 5, paragraph 1, letter f)
|
Installation of systems for the management and automatic control of heating and electrical systems. |
40% of eligible expenses, up to €100,000. |
Electric Vehicle Charging InfrastructureII.G – Art. 5, paragraph 1, letter g)
|
Installation of private charging infrastructure at the building or its appurtenances, carried out in conjunction with the replacement of the air conditioning system with electric heat pumps. |
30% of eligible expenses, with different caps depending on power output. |
Photovoltaic and Energy Storage SystemsII.H – Art. 5, paragraph 1, subparagraph h)
|
Installation of photovoltaic systems and related storage systems, carried out in conjunction with the replacement of the air conditioning system with electric heat pumps. |
20% of the maximum eligible cost, with caps depending on the size of the photovoltaic system and the storage system. |