Summary

Scope of the contract: Preparation of pre-renovation energy audits for two buildings used as nursing homes located in the city of Brescia.

Objective of the project: The objective of the pre-renovationenergy audits isto determine the actual energy consumption of the buildings and to recommend possible energyefficiency improvements .

Key information

Client Name: A company operating in northern Italy in the fields of air conditioning systems, district heating, and energy efficiency

Project Name: Pre-renovation Energy Assessments for a Nursing Home in Brescia

Project Period: March 2024

Buildings involved: Two buildings used as nursing homes, with a total volume of 30,100 cubic meters, are the subject of the assessment.

Description of Activities: The work involves preparing pre-renovation energy audits for two nursing home buildings in the municipality of Brescia.

Activities Conducted During Pre-Intervention Energy Audits

Specifically, the activities carried out are:

  • theanalysis of the documentation made provided;
  • site inspection;
  • Definition of the thermal baseline of energy consumption consumptionfor each building;
  • the modeling of properties in Edilclima;
  • The editorial staff of the reports of energy energy.

With this approach, one define all the features of the buildings from which calculate i needs by energy and the consumption by fuel and electricity. Based on the issues identified, recommendations will then be made regarding presentations for energy energy.

Analysis of Energy Consumption and Calculation of Building Energy Performance

Specifically, the buildings subject to energy audits prior to renovation date back to before the 1950s and are served by district heating. Once the data on properties and built the baselines for energy, and constructed the models in Edilclima that made it possible to calculate:

  • consumption;
  • energy performance indicators;
  • Identify the energy efficiency class.

Recommended Energy Efficiency Measures

Based on the critical issues identified, the following the following measures to energy energy, such as:

  • the replacement of the heat exchangers in the district heating to improve generation efficiency;
  • theapplication of inverters to pumps for circulation or replacement with electronic pumps to improve distribution efficiency;
  • the work on systems for control, for example, with theintroduction of zone ;
  • relamping projects.

Discover the Enertech Solution method for energy audits

For more information on the energy audit from Enertech Solution, read our dedicated article or contact our team.

Do you need counseling?

Fill out the form, and we will get back to you as soon as possible.

Contact us