Summary

Scope of the contract: Detailed design of two heating and cooling plants for two school buildings within a hub in the province of Brescia.

Project Objective: Preparation of BIM-based detailed design documents, including drawings, quantity takeoffs, and technical reports, in coordination with the designers of the other systems.

Key information

Client Name: Multiutility of Northern Italy

Project Name: Detailed Design for the School Hub in the Province of Brescia

Project Period: March–June 2026

Total cost of the project: €1,200,000

Buildings involved: School Complex consisting of three separate buildings

Brief description of the planned activities

The Building Services Configuration of the Main Building

The facility in question consisted of two thermal power plants supplied by a district heating network.

The largest building featured the following main elements:

  • Two district heating substations for the heating system, with a total capacity of 400 kW;
  • A 120-kW substation dedicated to DHW production;
  • A substation dedicatedto powering a power absorber with a capacity of 541 kW;
  • A hot-water absorber for the production of chilled water with a capacity of 345 kWf;
  • Two water- cooled electric tower refrigeration units of 618 kWf each;
  • Two rooftop evaporative cooling towers, each with a heat removal capacity of 638 kWt.

The heating plant was located in the basement but was electrically and hydraulically connected to the roof to supply the evaporative cooling towers.

Coordination with the other facilities serving the school

The main challenge of the BIM construction drawings lay in the careful coordination required to avoid interfering with the school’s other systems, such as:

  • UTA,
  • secondary distribution lines
  • fire suppression system.

The district heating substation for the smaller building

The smaller building, on the other hand, was designed to house a district heating substation with a dual heat exchanger for domestic hot water and heating, with a capacity of 100+320 kW.

Development of the BIM construction drawings using Revit and a 3D model

The construction drawings were developed using the BIM methodology using Revit software to produce drawings with a high level of detail and specific elements.

Coordination was carried out by uploading the 3D modelto the dedicated ACDat platform so that all parties could view the project’s progress and changes.

Learn More About BIM Methodology

To learn more about the use of BIM in the various design and operational phases, you can read the articles dedicated to the BIM models on construction sites , the benefits of digital construction management, and the 7+3 dimensions of BIM.

If you’re interested in our BIM design services, please contact our Enertech Solution team or visit the dedicated service page.

BIM design

Do you need counseling?

Fill out the form, and we will get back to you as soon as possible.

Contact us