Scope of the Contract: Preparation of the Technical-Economic Plan (PTE) in accordance with the CONSIP SIE4 agreement .
Project Objective: To identify the optimal set of retrofit measures capable of achieving the energy-saving goals for the building portfolio over two different time frames specified in the Technical-Economic Plan.
Key information
Client Name: A multinational corporation operating in the natural gas production and distribution , renewable energy, and services sectors .
Project Name: PTE for a municipality in the Metropolitan City of Turin.
Project Period: April – July 2023
Total project cost: €838 ,860 (extended PTE)
Buildings involved: 20 municipal buildings, totaling over 18,000 m2
Description of activities:
During the technical and economic feasibility study, site visits were conducted to collect technical data in order to identify the actions needed to address any critical issues in the building-systems complex and implement energy-saving strategies.
Two different contract terms were evaluated: 6 years (standard PTE) and 9 years (extended PTE), and improvement and renovation initiatives were identified for the buildings covered by the Technical-Economic Plan in order to achieve heating energy savings of 25% and 30%, respectively, for the least energy-efficient buildings.
Among the proposed measures for both contract terms are the replacement of existing boilers with high-efficiency condensing boilers and the installation of a heat exchanger to separate the primary and secondary circuits. Also planned are the installation of thermostatic valves and circulators with inverters, as well as remote monitoring and management systems .
To achieve greater energy savings over a 9-year contract term, additional measures were proposed , such as replacing obsolete air-handling units with new units equipped with heat recovery systems, insulating uninsulated attics, insulating exterior walls with exterior insulation, and replacing windows and doors. The cost of the work proposed in the extended PTE is more than double that of the standard PTE.
In addition, plans have been made for extraordinary maintenance, regulatory compliance upgrades, and the installation of monitoring systems.