Scope of the contract: Preparation of the bid proposal for the competitive bidding process to construct photovoltaic systems for CAP Holding – Project 9676 – Photovoltaic Master Plan – divided into 3 lots.

Purpose of the contract: Construction , testing, and maintenance of photovoltaic systems for the production of electricity from renewable sources within the context of wastewater treatment plants, water supply systems, and sewer systems managed by the CAP Group and Alfa s.r.l.
The contract has a duration of 13 years (3 years for the construction and testing of individual projects and a 10-year maintenance contract beginning upon the testing of each individual system).

Key information

Client Name: A leading Italian company in the design, construction, and management of energy systems.

Contract Name: Photovoltaic Master Plan: Supply and testing of photovoltaic power generation systems at the facilities of the Cap Group and Alfa s.r.l., divided into 3 lots.

Project Period: January – March 2023

Total Contract Amount: The total contract amount is €11,187,512.58 (excluding VAT), of which €3,258,345.22 is for Lot 3.

Buildings involved: The “Photovoltaic Master Plan” project, divided into three lots, calls for the installation of photovoltaic systems at the wastewater treatment plants, water supply facilities, and sewer systems managed by the CAP Group and Alfa s.r.l., as well as at sites or buildings that may become available to the CAP Group and Alfa during the term of the contract

The project began with a careful analysis of the bid documents and participation in coordination meetings with the client in order to develop a shared strategy for preparing the Master Plan.

Next, the technical proposal was drafted. This consists of sections regarding the certifications held by the Client that are required under the tender specifications; safety management (to protect health and ensure workplace safety); the organization of the entire contract to ensure the highest quality of services provided; the technical proposal, which outlines the key features of the proposed components and the long-term performance of the photovoltaic systems covered by the contract; the full-risk warranty and routine maintenance (optimization of the Maintenance Plan serving as the basis for the tender) as well as non-routine maintenance (in accordance with the provisions of the tender documents); finally, the “Additional Services” section, which summarizes the distinctive features of certain proposed solutions (development of BIM models, installation of weather stations, photovoltaic optimizers, renewable energy communities, access to incentive programs, dissemination of the environmental benefits achieved, and use of drones for visual inspection).