Summary
Subject of the contract:Engineering services for the detailed design and construction supervision of the mechanical systems forthe expansion of a cleanroom.
Objective of the contract : Development of the definitive and executive design relating to the energy requalification and functional reorganization of the clean room spaces .
Key information
Client Name: A leading international player in the world of engineering and innovation
Project Name: Detailed Design for the Expansion of a Cleanroom
Project Period: May 2025 – January 2026
Total cost of the work: Approximately €85,000
Buildings involved: Cleanroom
Brief description of the planned activities:
The technical surveys and thefeasibility studies have been carried out with the aim of integrating the new areas into the plant plant , with specific reference to the HVAC systems and plumbing and sanitation systems.
Next, they proceeded with the verification of the hydraulic circuits and air-handling systems already present in the cleanroom, in addition to the energy modeling for calculating the needs and thepower increase required for the thermal loads and refrigerators.
Finally, the executive plan for the expansion of the clean room , providing:
- functional diagrams;
- site plans;
- block diagrams;
- bill of quantities.